University of Edinburgh

The Mary Brück Building at Edinburgh University houses the staff and students of both the School of Engineering and School of Biological Sciences. The two major challenges presented by this build were firstly the urgency with which the University required the facility, and secondly that the build needed to be completed in a live student environment.

To fit the mixed needs of the students and faculty the building included; a social area, engineering study facilities, administration facilities, research facilities, common rooms, meetings room, kitchen facilities and a group and individual study area to accommodate up to 120 students.

Our installation team positioned the building on site within 10 days and 70% of the fit-out of the buildings was conducted off-site in advance, keeping disruption at the busy University to an absolute minimum.